All Flexibility products are designed according to customers’ individual requirements. The E.ON D-Gas caverns are capable of operating at high deliverability and injection rates as well as high operational flexibility; e.g.:
- H-Cal service with the trading point TTF as the delivery point
- High ratio of injection/withdrawal capacity
- Working gas volume for firm continuous 15 days service, possibility to increase and decrease
- Short start-up/shut-down times with the capability of within 1-hour rapid response
- Rapid turn-around flow capabilities without cycling restrictions
- Possibility to handle low minimum flow rates of injection and withdrawal